---
title: "Commercial Solar PV Installation Blackpool &amp; Fylde Coast | Northern Tec Ltd"
description: "Convert daytime electricity from a P&amp;L cost into an asset on the balance sheet, typical 50kWp warehouse array repays in 4–6 years with current commercial tariffs."
lang: en-GB
json-ld: |
  [
    {
      "@context": "https://schema.org",
      "@type": "Organization",
      "@id": "https://northern-tec.co.uk/#organization",
      "name": "Northern Tec Ltd",
      "url": "https://northern-tec.co.uk",
      "logo": "https://northern-tec.co.uk/apple-touch-icon.png",
      "telephone": "01253 272 451",
      "email": "info@northern-tec.co.uk",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "47 Rossall Rd",
        "addressLocality": "Cleveleys",
        "addressRegion": "Lancashire",
        "postalCode": "FY5 1HG",
        "addressCountry": "GB"
      },
      "sameAs": [
        "https://www.facebook.com/northerntecltd",
        "https://share.google/EnKHdilqE1L7n6iCz"
      ]
    },
    {
      "@context": "https://schema.org",
      "@type": "WebSite",
      "@id": "https://northern-tec.co.uk/#website",
      "url": "https://northern-tec.co.uk",
      "name": "Northern Tec Ltd",
      "publisher": {
        "@id": "https://northern-tec.co.uk/#organization"
      },
      "inLanguage": "en-GB"
    },
    {
      "@context": "https://schema.org",
      "@type": [
        "LocalBusiness",
        "Electrician"
      ],
      "@id": "https://northern-tec.co.uk/#localbusiness",
      "name": "Northern Tec Ltd",
      "image": "https://northern-tec.co.uk/apple-touch-icon.png",
      "logo": "https://northern-tec.co.uk/apple-touch-icon.png",
      "url": "https://northern-tec.co.uk",
      "telephone": "01253 272 451",
      "email": "info@northern-tec.co.uk",
      "priceRange": "££",
      "address": {
        "@type": "PostalAddress",
        "streetAddress": "47 Rossall Rd",
        "addressLocality": "Cleveleys",
        "addressRegion": "Lancashire",
        "postalCode": "FY5 1HG",
        "addressCountry": "GB"
      },
      "geo": {
        "@type": "GeoCoordinates",
        "latitude": 53.8821841,
        "longitude": -3.0395278
      },
      "areaServed": [
        "Blackpool",
        "Fylde Coast",
        "Lancashire",
        "Preston",
        "Lancaster"
      ],
      "sameAs": [
        "https://www.facebook.com/northerntecltd",
        "https://share.google/EnKHdilqE1L7n6iCz"
      ],
      "openingHoursSpecification": [
        {
          "@type": "OpeningHoursSpecification",
          "dayOfWeek": "Monday",
          "opens": "08:00",
          "closes": "17:00"
        },
        {
          "@type": "OpeningHoursSpecification",
          "dayOfWeek": "Tuesday",
          "opens": "08:00",
          "closes": "17:00"
        },
        {
          "@type": "OpeningHoursSpecification",
          "dayOfWeek": "Wednesday",
          "opens": "08:00",
          "closes": "17:00"
        },
        {
          "@type": "OpeningHoursSpecification",
          "dayOfWeek": "Thursday",
          "opens": "08:00",
          "closes": "17:00"
        },
        {
          "@type": "OpeningHoursSpecification",
          "dayOfWeek": "Friday",
          "opens": "08:00",
          "closes": "17:00"
        }
      ],
      "aggregateRating": {
        "@type": "AggregateRating",
        "ratingValue": "5.0",
        "reviewCount": "77",
        "bestRating": "5"
      }
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Home",
          "item": "https://northern-tec.co.uk/"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Services",
          "item": "https://northern-tec.co.uk/services"
        }
      ]
    },
    {
      "@context": "https://schema.org",
      "@type": "Service",
      "name": "Commercial Solar PV Installation",
      "serviceType": "Commercial Solar PV Installation",
      "provider": {
        "@type": "ElectricalContractor",
        "name": "Northern Tec Ltd",
        "telephone": "01253 272 451",
        "address": {
          "@type": "PostalAddress",
          "streetAddress": "47 Rossall Rd",
          "addressLocality": "Cleveleys",
          "addressRegion": "Thornton-Cleveleys",
          "postalCode": "FY5 1HG",
          "addressCountry": "GB"
        }
      },
      "areaServed": "Blackpool, Fylde Coast, Lancashire, United Kingdom",
      "description": "Convert daytime electricity from a P&L cost into an asset on the balance sheet, typical 50kWp warehouse array repays in 4–6 years with current commercial tariffs.",
      "url": "https://northern-tec.co.uk/services/commercial-solar-pv-installation"
    },
    {
      "@context": "https://schema.org",
      "@type": "FAQPage",
      "mainEntity": [
        {
          "@type": "Question",
          "name": "How big a system can my roof take?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Roughly 1kWp per 5–6m² of usable south, east or west-facing roof. A 1000m² warehouse roof typically carries 100–180kWp depending on pitch, orientation, plant and roof access requirements."
          }
        },
        {
          "@type": "Question",
          "name": "Will it affect my existing roof warranty?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Not when installed correctly. We coordinate with your roof manufacturer's accredited installer for any penetrations, or use ballasted mounting on flat roofs to avoid penetrations entirely."
          }
        },
        {
          "@type": "Question",
          "name": "Do I need planning permission?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Commercial solar under permitted development typically does not need planning, but listed status, conservation areas and proximity to airports (relevant for Blackpool sites near the airfield) can trigger consent. We check first."
          }
        },
        {
          "@type": "Question",
          "name": "How disruptive is the installation?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "We mobilise scaffold or MEWP outside trading hours where possible. The bulk of works happen on the roof with minimal impact on ground-floor operations."
          }
        },
        {
          "@type": "Question",
          "name": "What capital allowances apply?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Solar PV qualifies for the full-expensing first-year allowance for limited companies (subject to current HMRC rules), effectively a 25% corporation tax reduction on the system cost in year one. We'll confirm with your accountant before sign-off."
          }
        },
        {
          "@type": "Question",
          "name": "Can I add battery storage later?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Yes, if we specify a battery-ready inverter at install. Adding storage later is straightforward and increases self-consumption by 10–25 percentage points."
          }
        },
        {
          "@type": "Question",
          "name": "What happens if my roof needs replacing in 10 years?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "We design with removable mounting where possible. Re-roofing typically takes 3–5 days of panel removal and reinstall, included in standard maintenance contracts."
          }
        },
        {
          "@type": "Question",
          "name": "Do you provide annual maintenance?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Yes, annual visual inspection, electrical testing of DC and AC sides, inverter firmware checks and panel cleaning where access allows. Quoted as an optional retainer."
          }
        },
        {
          "@type": "Question",
          "name": "Do you cover emergency call-outs across Blackpool & the Fylde Coast?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Yes, we hold reactive slots open weekly for landlords, agents and commercial clients. Genuine no-power and safety call-outs are prioritised same-day where possible across Blackpool, Cleveleys, Fleetwood, Lytham, St Annes, Poulton, Thornton, Preston, Lancaster and Morecambe."
          }
        },
        {
          "@type": "Question",
          "name": "Are you fully insured and NICEIC approved?",
          "acceptedAnswer": {
            "@type": "Answer",
            "text": "Yes. Northern Tec Ltd carries £5m public liability insurance and is an NICEIC-approved electrical contractor. Every job is logged, audited and certified, never sub-contracted out."
          }
        }
      ]
    },
    {
      "@context": "https://schema.org",
      "@type": "BreadcrumbList",
      "itemListElement": [
        {
          "@type": "ListItem",
          "position": 1,
          "name": "Home",
          "item": "https://northern-tec.co.uk/"
        },
        {
          "@type": "ListItem",
          "position": 2,
          "name": "Services",
          "item": "https://northern-tec.co.uk/services"
        },
        {
          "@type": "ListItem",
          "position": 3,
          "name": "Commercial Solar PV Installation",
          "item": "https://northern-tec.co.uk/services/commercial-solar-pv-installation"
        }
      ]
    }
  ]
---

[01253 272 451 ](tel:01253272451)[info@northern-tec.co.uk](mailto:info@northern-tec.co.uk)47 Rossall Rd, Cleveleys FY5 1HG 

Mon–Fri 08:00–17:00 

[![Northern Tec Ltd, Electrical Contractors](/assets/northern-tec-logo-CrIyjtbi.png)](/)

[Services](/services)

[Areas](/service-areas)

[About](/about)[Our Work](/our-work)[Reviews](/reviews)[Contact](/contact)

[01253 272 451](tel:01253272451)[Request Estimate](/contact)

![Commercial rooftop solar PV installation spanning a large industrial unit roof by Northern Tec](/assets/commercial-solar-card-CPpb7Mmn.jpg)

1.  [Home](/)
2.  [Services](/services)
3.  Commercial Solar PV Installation 

Service · Blackpool & Fylde Coast

# Commercial Solar PV  
for Lancashire businesses   
, ROI in 4–6 years

Convert daytime electricity from a P&L cost into an asset on the balance sheet, typical 50kWp warehouse array repays in 4–6 years with current commercial tariffs.

[Request Free Estimate](/contact) [01253 272 451](tel:01253272451)

20+ years combined · NICEIC approved · 12-month workmanship guarantee

![NICEIC Approved Contractor](/__l5e/assets-v1/fc0e8f90-bcac-4a95-adfe-47fed589fbe7/niceic.png)![CHAS Accredited Contractor](/__l5e/assets-v1/a4a8b321-f309-4b28-b910-a9222c1b5450/chas.webp)![MCS Certified](/__l5e/assets-v1/723ec165-964b-414a-9615-194bfe6ab0a3/mcs.png)![Registered Competent Person Electrical](/__l5e/assets-v1/d57ceabd-8cea-4ccb-9065-55e3a8f537ea/competent-person.webp)![Trustpilot Five Star Reviews](/__l5e/assets-v1/fb9ddd01-5ba5-4a67-abd3-6f0f47379180/trustpilot.webp)

20+

Years combined experience

6

Directly-employed electricians

1,000+

Fylde Coast jobs completed

12 months

Workmanship guarantee

24 hours

Avg. response time

Service overview

## What commercial solar pv installation actually involves.

**What it is,** Commercial solar PV is roof or ground-mounted generation sized to your daytime base load, designed for maximum self-consumption rather than export, with optional battery for after-hours protection.

**Who it's for,** SMEs with daytime operations: warehousing, light manufacturing, retail, hotels, care homes, schools, and commercial landlords adding ESG-credible upgrades to lettable space.

**When you need it,** Before your next commercial energy contract renewal, alongside an EV charger rollout for fleet, when re-roofing, or as part of a capital allowance planning exercise.

**Why it matters,** Commercial electricity sits at 28–35p/kWh; PV displaces that at a lifetime cost of 4–6p/kWh. Capital expenditure qualifies for full first-year capital allowances, dropping effective payback further.

Request a quote

### Free written estimate within 24 hours.

No-obligation, fixed-price quote with the certificate detail included.

What happens if you delay

## The cost of putting it off.

Common, concrete consequences we see across the Fylde Coast every month, not scare tactics, just what's documented.

-   1 
    
    Roof structural surveys skipped at quote stage lead to retrofitted ballast at install, six-figure cost over-runs.
    
-   2 
    
    Inverters undersized to save cost waste 8–12% of annual yield through clipping on bright days.
    
-   3 
    
    Specifying export-led systems on a low-export tariff misses the whole financial case, self-consumption is the prize.
    
-   4 
    
    Failing to coordinate G99 application with the DNO can delay commissioning by 6–12 months.
    
-   5 
    
    Cheap roof penetrations void roof warranties, a £30k bill on a 10-year-old composite roof.
    

Our process

## A five-step system, no surprises.

1.  Step 1
    
    ### On-site inspection
    
    We attend the property, photograph the existing installation and confirm the scope in person, never quoting blind from a phone call.
    
2.  Step 2
    
    ### Written diagnosis & fixed quote
    
    You receive a clear breakdown by email: what we'll do, the parts used, the certificate issued, and a fixed price with no day-rate surprises.
    
3.  Step 3
    
    ### Scheduled installation
    
    Booked into a confirmed slot with a named lead electrician. We turn up on time, in branded vans, with the materials on board.
    
4.  Step 4
    
    ### Testing & certification
    
    Every install is tested under BS 7671 and signed off with the relevant NICEIC / Part P certificate uploaded to your portal.
    
5.  Step 5
    
    ### Aftercare & 12-month guarantee
    
    12 months on workmanship plus manufacturer warranties on parts. One phone number, Alex or Jack, for anything that needs revisiting.
    

Benefits

## What you actually get.

### ROI in 4–6 years

Typical 50–100kWp commercial array on a warehouse roof repays in 4–6 years at current pence/kWh.

### Hedge energy prices

Lock in 25 years of generation at sub-6p/kWh, independent of supplier renewal pressure.

### Full capital allowances

Solar PV qualifies for full-expensing first-year capital allowances on commercial systems.

### ESG & B-Corp credentials

Verified kWh generation supports Scope 2 reporting and tenant ESG requirements.

### Re-let value

Owner-occupiers and commercial landlords add ~7–12% to property valuation with embedded generation.

### EV fleet synergy

Daytime generation matches workplace EV charging perfectly, fleet fuel from your own roof.

Specification & method

## How we deliver, in detail.

We size commercial systems against half-hourly metered consumption, run structural surveys with a chartered partner, and project-manage G99 applications with Electricity North West in-house.

### Materials & equipment

-   Trina 600W bi-facial and JA Solar 580W mono-PERC panels for commercial roof arrays
-   Solis, Huawei SUN2000 and Sungrow three-phase string inverters from 15kW to 110kW
-   K2 Systems Speedrail and MiraTec ballasted mounting for membrane and composite roofs
-   Commercial LiFePO4 battery cabinets from Pylontech Powercube and BYD HVS for after-hours protection

### Method & standards

-   Half-hourly consumption analysis to size for ~85% self-consumption (the sweet spot for ROI)
-   Structural survey by partner chartered structural engineer before any quote is signed
-   G99 fast-track application managed with Electricity North West, typical 4–8 week DNO turnaround
-   Commissioning with DC string testing, AC isolation tests and inverter firmware lock

### Variations of this service

-   Roof-mounted on pitched composite/metal roofs (standard for warehousing)
-   Ballasted flat-roof installs on membrane and felt, zero penetrations
-   Ground-mounted arrays on adjacent yard space, common for rural light industrial
-   Carport solar combining shaded parking with EV charging infrastructure

### Where it applies on the Fylde Coast

-   Warehouses 500–5000m² in Squires Gate, Whitehills and Preston, 50–500kWp typical
-   Holiday parks and caravan sites, base-load matches midday demand for hot water and amenities
-   Care homes and schools, daytime occupancy matches generation perfectly
-   Hotels in Blackpool and Lytham, generation offsets daytime air-conditioning and kitchen loads

### Residential vs commercial

Commercial PV is sized for daytime self-consumption (not export), uses three-phase string inverters, requires G99 application, qualifies for full capital allowances, and is structurally surveyed, a different financial and engineering exercise to the domestic install entirely.

### Related services

-   [Solar PV & Battery Storage ](/services/solar-pv-battery-storage)
-   [Commercial EV Charger Installation ](/services/commercial-ev-charger-installation)
-   [Commercial Electrical Installation & Testing ](/services/commercial-electrical-installation-testing)

#### Useful links

-   [Northern Tec homepage](/)
-   [Service areas we cover](/service-areas)
-   [Verified client reviews](/reviews)
-   [Request a free estimate](/contact)

Our work

## A wider look at recent Northern Tec projects.

A general preview of installations and testing work photographed on site across our recent jobs.

![BS 5839 fire alarm control panel installation, Fylde Coast](/assets/2024-08-09-1-9UoahsnT.jpg)

![Commercial electrical wiring works by Northern Tec](/assets/2024-08-09-2-BtelNsbB.jpg)

![New RCBO consumer unit installed and certified](/assets/2024-08-09-3-DaCpFF7N.jpg)

![Northern Tec electrical contractor van on site in Blackpool](/assets/2024-08-09-4-C9qW0JGw.jpg)

![LED feature lighting fitted into an arched alcove](/assets/2024-08-09-5--tFiXM9S.jpg)

![Hallway arch finished with concealed LED lighting](/assets/2024-08-09-6-D8qQbU4m.jpg)

![Northern Tec Ltd electrical contractors office, Cleveleys](/assets/2024-08-09-7-Ctzguyrv.jpg)

![Home EV charge point installed on a brick wall](/assets/2024-08-09-Ng9bcKS4.jpg)

![Commercial premises rewired and certified by Northern Tec](/assets/2024-08-10-C5Jy4xya.jpg)

![LED-lit bathroom mirrors and vanity lighting install](/assets/2024-12-04-2-BBvWRZ_5.jpg)

![LED strip lighting fitted along a domestic staircase](/assets/2024-12-04-3-BF1uLJRG.jpg)

![Interior arches illuminated with concealed LED lighting](/assets/2024-12-04-4-65HCMla-.jpg)

![LED arched doorway lighting in a refurbished home](/assets/2024-12-04-5-BNcpybId.jpg)

![Bathroom wall niche finished with concealed LED lighting](/assets/2024-12-04-6-DS8O7aSf.jpg)

![Backlit LED bathroom mirror installation](/assets/2024-12-04-7-DYTaswi4.jpg)

![External LED floodlight with PIR sensor installed](/assets/2024-12-04-Dx4kHbRc.jpg)

![RCBO trip test on a newly installed consumer unit](/assets/2024-12-05-1-DZEqiy_y.jpg)

![Garden path LED bollard lighting installation](/assets/2024-12-05-D5ksvy4B.jpg)

![Commercial electrical install carried out from a scissor lift](/assets/2025-05-06-1-Ds5rTx7E.jpg)

![Commercial bar interior fitted with LED feature lighting](/assets/2025-05-06-2-DEzFJhTP.jpg)

![Northern Tec Ltd electrical contractors premises, Cleveleys](/assets/2025-05-06-J_sNOZ28.jpg)

![Acoustic wood slat feature wall with concealed LED downlighting in a Fylde Coast home](/assets/2025-11-14-1-DO_QauKO.jpg)

![NICEIC Approved Contractor branded workwear worn by a Northern Tec electrician on site](/assets/2025-11-14-2-DCZ5wlZw.jpg)

![Northern Tec engineer carrying out a commercial first-fix electrical installation](/assets/2025-11-14-3-D3mXWeWe.jpg)

![Domestic solar PV array installed on a new-build Lancashire home by Northern Tec](/assets/2025-11-14-4-74YpNaWC.jpg)

![Exterior garden lighting scheme with LED pergola and raised bed strip lights at dusk](/assets/2025-11-15-1-CDNTz2Y-.jpg)

![Commercial first-fix electrical installation with cable tray, conduit and rotary isolators](/assets/2025-11-15-2-Dyb6NWYG.jpg)

![Northern Tec engineers on site at a new-build residential project on the Fylde Coast](/assets/2025-11-15-3-BVwKurN1.jpg)

![Stack of EO Mini Pro and QubEV smart EV charger units ready for installation at Northern Tec HQ](/assets/2025-11-20-1-B_9Oz2ug.jpg)

![Northern Tec electrician carrying out periodic electrical inspection and testing on an external meter cabinet](/assets/2025-11-20-2-6qgzq5O7.jpg)

![Northern Tec engineer first-fixing electrical cable through composite decking on a rooftop terrace](/assets/2025-11-20-3-EDcpk0ii.jpg)

![Northern Tec director with a new Project EV smart charger ready for a Fylde Coast installation](/assets/2025-11-20-4-f1HXFCNr.jpg)

![Commissioning an Ohme home EV charge point with a Megger EV charger test adapter](/assets/2025-11-20-5-D-WBQEOx.jpg)

![Myenergi Zappi GLO smart EV charger installed on a domestic brick wall by Northern Tec](/assets/2025-11-20-6-Cxxf6HvB.jpg)

![Northern Tec electrician wiring in a new home EV charge point on a brickwork facade](/assets/2025-11-20-7-DMwVZOO0.jpg)

![Bespoke geometric panelled feature wall with up-down LED wall lights installed by Northern Tec](/assets/2025-11-20-8-yPtepoTu.jpg)

![Walk-in shower with concealed LED strip lighting and dark contemporary fittings installed by Northern Tec](/assets/2025-11-21-1-D7zpV4gv.jpg)

![Exterior soffit downlights and black feature cladding fitted on a modern garage conversion](/assets/2025-11-21-2-Degf5_yQ.jpg)

![Close-up of an Ohme home EV charger plugged in and ready to charge on a brick wall](/assets/2025-11-21-3-CrGb_niE.jpg)

![Exterior up-down wall lights illuminating a brick extension and patio at dusk](/assets/2025-11-21-4-Ds8RKajJ.jpg)

![Kitchen island with warm LED underlighting and illuminated splashback installed by Northern Tec](/assets/2025-11-21-5-C9UWDeQr.jpg)

![Northern Tec electrician carrying out testing and inspection on a distribution board with a Megger test instrument](/assets/2025-11-21-6-Ceb69Zno.jpg)

![Sync EV home charger installed on a rendered exterior wall with neatly dressed cable management](/assets/2025-11-21-7-TZuyPhJN.jpg)

![Domestic solar PV panel array installed on a tiled roof](/assets/2025-11-24-1-CeS2swgI.jpg)

![Northern Tec electrical contractor vans on the Fylde Coast](/assets/2025-11-24-2-gv8ylXQ-.jpg)

![Northern Tec vans by Cleveleys seafront](/assets/2025-11-24-Cq26Ivv-.jpg)

![Northern Tec electrician first-fixing socket cabling through a new stud partition wall on a commercial fit-out](/assets/2025-12-04-1-DRgDuZBP.jpg)

![Sync Energy Wall Charger 2 socket and tethered EV chargers ready for installation at Northern Tec HQ](/assets/2025-12-04-2-DiKt_nLN.jpg)

![Pedestal-mounted commercial EV charge point installed outside a Lancashire business unit by Northern Tec](/assets/2025-12-04-3-DkzCHzgz.jpg)

![Northern Tec electrician dressing first-fix cabling on a blockwork wall during a new-build project](/assets/2025-12-04-4-CT0ctqkV.jpg)

![Commercial pedestal-mounted EV charger installation](/assets/2026-02-08-uSRMap5K.jpg)

![Scaffolded commercial solar PV installation in progress](/assets/2026-04-03-1-vRjCJYD3.jpg)

![Aerial view of completed commercial rooftop solar PV array](/assets/2026-04-03-1-CPHT98Py.png)

![Commercial solar PV panels on an industrial unit roof](/assets/2026-04-03-10-C0BnMkCo.jpg)

![Tethered home EV charge point installation on brickwork](/assets/2026-04-03-11-BHw5x3vp.jpg)

![EV charger commissioning with a Megger MFT test instrument](/assets/2026-04-03-12-bQWmqsfc.jpg)

![Ohme home EV charge point installed and commissioned](/assets/2026-04-03-13-T8DwPCAt.jpg)

![Pitched commercial roof fully covered with solar PV panels](/assets/2026-04-03-14-RA7V5EKA.jpg)

![Live testing of a newly installed home EV charge point](/assets/2026-04-03-15-BwGL_ibk.jpg)

![Outdoor mains socket EICR testing by a Northern Tec electrician](/assets/2026-04-03-16-flBkPsEW.jpg)

![Northern Tec electrician on site at a domestic property](/assets/2026-04-03-17-Cz77E98r.jpg)

![Ohme EV charger fitted beside garden planting](/assets/2026-04-03-18-C5dGJ9kW.jpg)

![Close-up of a domestic EV charger with weatherproof socket cover](/assets/2026-04-03-19-cD9wnIHb.jpg)

![Northern Tec electrician installing a home EV charge point](/assets/2026-04-03-2-BIRD5IzQ.jpg)

![Aerial view of a completed domestic solar PV array](/assets/2026-04-03-20-fDxiMbNL.jpg)

![Wall-mounted EV charger on a rendered domestic exterior](/assets/2026-04-03-18-C5dGJ9kW.jpg)

![Home EV charger fitted under the eaves of a Fylde Coast property](/assets/2026-04-03-19-cD9wnIHb.jpg)

![Electrician commissioning an EV charger installation](/assets/2026-04-03-20-fDxiMbNL.jpg)

![EV charger paired with consumer unit at a commercial site](/assets/2026-04-03-24-Gv0lqlDu.jpg)

![Untethered EV charge point installed on a red brick wall](/assets/2026-04-03-25-65ltODbs.jpg)

![Domestic EV charger installed on brickwork](/assets/2026-04-03-26-Da01URYC.jpg)

![EV charge point fitted under brick eaves](/assets/2026-04-03-27-DPQmCZWp.jpg)

![Engineers commissioning a commercial rooftop solar PV array](/assets/2026-04-03-28-CNbIRI9m.jpg)

![Commercial-grade EV charger being installed and commissioned](/assets/2026-04-03-29-CrXpVyau.jpg)

![Solar PV inverters and DC isolators wall-mounted in a plant room](/assets/2026-04-03-3-DUq3WxLG.jpg)

![Northern Tec engineer inspecting installed commercial solar panels](/assets/2026-04-03-30-B_2AUVgp.jpg)

![EV charger plugged in to a domestic vehicle on a driveway](/assets/2026-04-03-31-CtGg3Bgt.jpg)

![Fully populated RCBO consumer unit with surge protection](/assets/2026-04-03-32-B2NZHwpX.jpg)

![Modern home EV charger installed by Northern Tec](/assets/2026-04-03-33-D5_r0S8O.png)

![Drone view of a residential solar PV installation](/assets/2026-04-03-4-CGdtC7kB.jpg)

![Commercial rooftop solar PV installation across an industrial unit](/assets/2026-04-03-5-DLKpFVxx.jpg)

![Wall-mounted Project EV charge point installation](/assets/2026-04-03-6-D-6tvio6.jpg)

![Three-phase commercial distribution board with isolators](/assets/2026-04-03-7-DEXz1yHm.jpg)

![Electrician fitting a domestic EV charge point](/assets/2026-04-03-8-bfgH2zI6.jpg)

![Solar PV inverter cabinet with battery storage components](/assets/2026-04-03-9-vYGrMmba.jpg)

![Northern Tec electrical project](/assets/commercial-solar-card-CPpb7Mmn.jpg)

![Northern Tec electrical project](/assets/domestic-ev-card-Bdt0thI7.jpg)

![Northern Tec electrical project](/assets/eicr-card-BzovKr-L.jpg)

Previous slide Next slide 

FAQ

## Questions we hear every week.

Not seeing your question? Call us on [01253 272 451](tel:01253272451).

How big a system can my roof take? 

Roughly 1kWp per 5–6m² of usable south, east or west-facing roof. A 1000m² warehouse roof typically carries 100–180kWp depending on pitch, orientation, plant and roof access requirements.

Will it affect my existing roof warranty? 

Do I need planning permission? 

How disruptive is the installation? 

What capital allowances apply? 

Can I add battery storage later? 

What happens if my roof needs replacing in 10 years? 

Do you provide annual maintenance? 

Do you cover emergency call-outs across Blackpool & the Fylde Coast? 

Are you fully insured and NICEIC approved? 

Areas we cover

## Commercial Solar PV Installation across the Fylde Coast & Lancashire.

-   [Commercial Solar PV Installation in Blackpool](/service-areas/blackpool)
-   [Commercial Solar PV Installation in Poulton-Le-Fylde](/service-areas/poulton-le-fylde)
-   [Commercial Solar PV Installation in Lytham](/service-areas/lytham)
-   [Commercial Solar PV Installation in Cleveleys](/service-areas/cleveleys)
-   [Commercial Solar PV Installation in Fleetwood](/service-areas/fleetwood)
-   [Commercial Solar PV Installation in Thornton](/service-areas/thornton)
-   [Commercial Solar PV Installation in Preston](/service-areas/preston)
-   [Commercial Solar PV Installation in St Annes-on-Sea](/service-areas/st-annes-on-sea)
-   [Commercial Solar PV Installation in Kirkham](/service-areas/kirkham)
-   [Commercial Solar PV Installation in Garstang](/service-areas/garstang)
-   [Commercial Solar PV Installation in Lancaster](/service-areas/lancaster)
-   [Commercial Solar PV Installation in Morecambe](/service-areas/morecambe)
-   [Commercial Solar PV Installation in Longridge](/service-areas/longridge)
-   [Commercial Solar PV Installation in Chorley](/service-areas/chorley)
-   [Commercial Solar PV Installation in Leyland](/service-areas/leyland)

Ready to book?

## Compliant, certified work, booked into your calendar this week.

Free written estimate within 24 hours. No-obligation, no high-pressure follow-up.

[Request Free Estimate](/contact) [01253 272 451](tel:01253272451)

NICEIC approved · 12-month workmanship guarantee · Fully insured

![Northern Tec Ltd](/assets/northern-tec-logo-CrIyjtbi.png)

NICEIC-approved electrical contractors serving private landlords, letting agents, homeowners and businesses across Blackpool and the Fylde Coast.

[01253 272 451 ](tel:01253272451)[info@northern-tec.co.uk](mailto:info@northern-tec.co.uk)

47 Rossall Rd, Cleveleys, Thornton-Cleveleys FY5 1HG 

[Facebook](https://www.facebook.com/northerntecltd)

### Services

-   [Domestic EV Charger Installation](/services/domestic-ev-charger-installation)
-   [Domestic Electrical Installation & Testing](/services/domestic-electrical-installation-testing)
-   [Commercial Electrical Installation & Testing](/services/commercial-electrical-installation-testing)
-   [Solar PV & Battery Storage](/services/solar-pv-battery-storage)
-   [Commercial Solar PV Installation](/services/commercial-solar-pv-installation)
-   [Commercial EV Charger Installation](/services/commercial-ev-charger-installation)
-   [EICR Reports](/services/eicr-reports)
-   [Consumer Unit Upgrades](/services/consumer-unit-upgrades)
-   [Fire Alarm Installation & Maintenance](/services/fire-alarm-installation-maintenance)
-   [All services →](/services)

### Service Areas

-   [Blackpool](/service-areas/blackpool)
-   [Poulton-Le-Fylde](/service-areas/poulton-le-fylde)
-   [Lytham](/service-areas/lytham)
-   [Cleveleys](/service-areas/cleveleys)
-   [Fleetwood](/service-areas/fleetwood)
-   [Thornton](/service-areas/thornton)
-   [Preston](/service-areas/preston)
-   [St Annes-on-Sea](/service-areas/st-annes-on-sea)
-   [Kirkham](/service-areas/kirkham)
-   [Garstang](/service-areas/garstang)
-   [Lancaster](/service-areas/lancaster)
-   [Morecambe](/service-areas/morecambe)
-   [Longridge](/service-areas/longridge)
-   [Chorley](/service-areas/chorley)
-   [Leyland](/service-areas/leyland)

### Hours

-   Mon 08:00–17:00 
-   Tue 08:00–17:00 
-   Wed 08:00–17:00 
-   Thu 08:00–17:00 
-   Fri 08:00–17:00 
-   Sat Closed 
-   Sun Closed 

© 2026 Northern Tec Ltd. All rights reserved. Company directors: Alex Evans & Jack. Registered in England & Wales · Company No. 15699109.

[Contact](/contact)[About](/about)[Case studies](/case-studies)[Privacy](/privacy-policy)[Terms](/terms-conditions)[Cookies](/cookie-policy)[Sitemap](/sitemap.xml)

[Call Now](tel:01253272451)[Get Estimate](/contact)